Unstructured stage - dynamic ranges

Post questions here relative to DataStage Enterprise/PX Edition for such areas as Parallel job design, Parallel datasets, BuildOps, Wrappers, etc.

Moderators: chulett, rschirm, roy

Post Reply
clarcombe
Premium Member
Premium Member
Posts: 515
Joined: Wed Jun 08, 2005 9:54 am
Location: Europe

Unstructured stage - dynamic ranges

Post by clarcombe »

Hello

Does anyone know how to set a dynamic range for the unstructured stage.

I can pass the range as a parameter into the Range Expression but it doesnt update the Template Data Range. This means every time the Excel sheet changes I lose some data.

Has anyone found a workaround for this ?

Thanks
WhatsApp Image 2023-03-02 at 16.26.06.jpeg
WhatsApp Image 2023-03-02 at 16.26.06.jpeg (20.63 KiB) Viewed 243 times
Colin Larcombe
-------------------

Certified IBM Infosphere Datastage Developer
Post Reply