Hi ,
Is it possible to scheduled the job (Director) to run for each and every hour ie) Assume that job is running now after one hour it need to run again.....,(My job will finished within 1/2 an hour) Thanks in advance
Scheduling thro director
Moderators: chulett, rschirm, roy
You can use the scheduler in the Director to do this. It will use the underlying OS system (cron on UNIX, at on Windows) to do this so that subsystem must be enabled.
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Yes, but there's no "every hour" setting - you need a separate entry for each time that you want the job to run. If it's already (still) running at any of these times, the new instance will not start.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.