sequencer--issue

Formally known as "Mercator Inside Integrator 6.7", DataStage TX enables high-volume, complex transactions without the need for additional coding.

Moderators: chulett, rschirm

Post Reply
kmalla
Participant
Posts: 2
Joined: Fri Nov 25, 2005 1:42 am

sequencer--issue

Post by kmalla »


hi all
let me give an example of my problem,
i am having 20 job activities which are kept in sequence.If my job aborts at job activity no:15 is their any provision for running the sequencer next time from job activity no:15 rather than from jobactivity no :1 :roll:
advance thanks
waiting for your respnce soon :wink:
ray.wurlod
Participant
Posts: 54607
Joined: Wed Oct 23, 2002 10:52 pm
Location: Sydney, Australia
Contact:

Post by ray.wurlod »

Welcome aboard! :D

You stand a better chance of an answer if you post in the correct forum. This one is for DataStage TX, which is not really about sequences.

The answer to your question is Yes.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
kcbland
Participant
Posts: 5208
Joined: Wed Jan 15, 2003 8:56 am
Location: Lutz, FL
Contact:

Post by kcbland »

Read the 7.5 manual on restartable Sequences and how to configure. There's some specific ways to make it work, you need to understand it fully and the manual spends the time discussing it.
Kenneth Bland

Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
Post Reply