Page 1 of 1

Unstructured stage - dynamic ranges

Posted: Thu Mar 02, 2023 9:27 am
by clarcombe
Hello

Does anyone know how to set a dynamic range for the unstructured stage.

I can pass the range as a parameter into the Range Expression but it doesnt update the Template Data Range. This means every time the Excel sheet changes I lose some data.

Has anyone found a workaround for this ?

Thanks
WhatsApp Image 2023-03-02 at 16.26.06.jpeg
WhatsApp Image 2023-03-02 at 16.26.06.jpeg (20.63 KiB) Viewed 19238 times

Re: Unstructured stage - dynamic ranges

Posted: Fri May 19, 2023 6:10 pm
by ray.wurlod
I don't know how to do this. Perhaps you could raise a PMR with IBM Support, who can escalate to Engineering if necessary.