Faliure in Sequence

Post questions here relative to DataStage Enterprise/PX Edition for such areas as Parallel job design, Parallel datasets, BuildOps, Wrappers, etc.

Moderators: chulett, rschirm, roy

Post Reply
satadru.kar
Participant
Posts: 14
Joined: Fri Dec 22, 2006 5:40 am
Location: Kolkata

Faliure in Sequence

Post by satadru.kar »

Hi Guys,

While running DS jobs through sequences I am getting the following error:

SeqLoadStgToCH_Level20..JobControl (@load_SProdInv): Controller problem: Error calling DSRunJob(load_SProdInv), code=-14
[Timed out while waiting for an event]


SeqLoadStgToCH_Level20 is the sequence name and load_SProdInv is the job name.

Can any body help me out how can I overcome with this problem? We are running arround 7-8 jobs parallel in the sequence and find that it takes arround 59 seconds to get this error. No of physical and logical nodes are 4 in our case.
Thanks,
Satadru Kar
ArndW
Participant
Posts: 16318
Joined: Tue Nov 16, 2004 9:08 am
Location: Germany
Contact:

Post by ArndW »

Satadru,

The Search facility for keyword "-14" returns 240 threads on this subject. Add that to the 1-minute wait period and you have your answer.
Post Reply