Page 1 of 1

routines and subroutines in datastage

Posted: Sun Jan 30, 2005 11:39 pm
by ghb
hi,
can anybody suggest good material or source for knowledge on routines and subroutines.

Posted: Sun Jan 30, 2005 11:45 pm
by ray.wurlod
The best source is the authoratitive source, the DataStage BASIC manual and the on-line help.

Re: routines and subroutines in datastage

Posted: Wed Dec 06, 2006 9:06 am
by pulagam
Hi i am also looking for same type of material for Routines and Before and After Subroutines .

1. Server jobs
2. Parellel jobs ( Enterprise Edition)
3. Mainframes jobs.( MVS Jobs)

please send me to psrsoft@yahoo.com


Thank you
pulagam

Posted: Wed Dec 06, 2006 10:36 am
by narasimha
You already have the material if you have these installed on your system.
Checking the built in Routines and Before and After Subroutines would be a good start.

Posted: Wed Dec 06, 2006 7:42 pm
by kduke
I give a lot of routines away on my tips page and the Tools4DataStage link below.

"Take, adapt and shine" in the words of a friend.

EtlStats alone has about 15.

Posted: Wed Dec 06, 2006 8:34 pm
by chulett
[waves]

Posted: Wed Dec 06, 2006 9:05 pm
by ray.wurlod
No, WAVES is part of QualityStage (Worldwide Address VErification System).
:lol: