Datastage Job Hangs
Posted: Tue Dec 01, 2009 8:55 am
Hi
We have created a job that is designed as follows
DRS - IPC - XF - XF - IPC - DRS
The jobs in Director shows it is still running where as the first link from the DRS to the IPC and the last link from the IPC - DRS show that they are finished (Only these 2 links are green, all others are Blue)
Any idea why this might be happening?
Thanks
We have created a job that is designed as follows
DRS - IPC - XF - XF - IPC - DRS
The jobs in Director shows it is still running where as the first link from the DRS to the IPC and the last link from the IPC - DRS show that they are finished (Only these 2 links are green, all others are Blue)
Any idea why this might be happening?
Thanks